• About Us
    • Management
    • Customers
    • Recognitions
    • Publications
    • Testimonials
    • Careers
  • Products
    • Aurora
      • Aurora Overview Video
      • Aurora News
      • Aurora Key Features
      • Domain Specific Deployments
      • Customer Applications
      • Recognition and Testimonials
      • Consultants / Partners
      • Aurora-SchAAS
      • Screenshots (Aurora)
      • Screenshots 2 (Aurora)
      • Screenshots (Aurora/Classroom)
    • Aurora-CCPM
      • Critical Chain Project Management
      • Why Was Aurora-CCPM Developed?
      • Advantages of Aurora-CCPM
      • Customers and Applications
      • CCPM Consultants and Partners
      • NASA Hallmarks of Success
      • Screenshots (Aurora-CCPM)
    • InfoTracker
    • DataMontage
  • Solutions
    • Planning & Scheduling
    • Decision Support
    • Education & Training
    • Space Applications
    • Autonomous Systems
    • Knowledge Management & Discovery
    • Machine Learning & Classification
  • News
    • In The News
    • Press Releases
    • Events
    • Press Contact
    • Newsletters
  • Artificial Intelligence
    • Glossary
    • History
    • Using Artificial Intelligence
    • Quotations
    • Links
  • Contact Us
    • San Mateo, CA
    • Colorado Springs, CO
U

Aurora Interface Overview

https://stottlerhenke.com/wp-content/uploads/2022/06/Aurora-Interface-Overview.mp4

 

 

Learn More

OFFICE LOCATIONS

Stottler Henke is headquartered at
1650 S. Amphlett Blvd., Suite 300 San Mateo, CA 94402.

The company also operates a software development office in Colorado Springs, CO.

CONTACT US

If you have any questions or comments, please contact us:

 

Phone: (650) 931-2700
Fax: (650) 931-2701

PRODUCTS

Aurora
Aurora-CCPM
Infotracker
DataMontage

PRIVACY
Privacy Policy

  • Follow
  • Follow
  • Follow

© 2024 Stottler Henke Associates, Inc. All rights reserved.

 
The problem solved by Aurora may be referred to as: optimized resource allocation, KPI (Key Performance Indicator) schedule optimization; production schedule / production scheduling; scenario planning; production planning of batch plants; parallel machine scheduling problem with setups, release and due dates and additional constraints related to the scarce availability of tools and human operators; multi-product multistage batch plant scheduling; multi-stage multi-product batch scheduling; multi-product multistage batch plant scheduling, parallel machine scheduling problem with sequence dependent setup times; campaign and lot size scheduling problem; economic lot scheduling problem (ELSP); parallel machine scheduling problem with sequence dependent setup times; scheduling problems with setup times and/or costs; sequence-dependent job scheduling; job scheduling using parallel non-identical machines with sequence dependent clearance times, mixed Integer Programming (MIP) scheduling / Mixed integer mathematical model.

The objective function normally being the minimization of makespan or project duration / maximization of throughput, with limited resources. Other solutions provide resource leveling, Aurora provides intelligent resource scheduling optimization.


Approaches used by others that Aurora outperforms, include the following: discrete event simulation; tabu search algorithm; mixed integer programming (MIP) scheduling / mixed integer mathematical model; Iterative two-stage decomposition solution strategy; genetic algorithms; multi-grid continuous-time formulations.

Aurora may be used as a complement or replaced for Microsoft Project, Primavera P6, Deltek Open Plan, PowerProject, Lynx TameFlow, Being Management 3, Exepron, ProChain, Concerto, Smartsheet, Wrike, Projectmanager, Teamwork, TeamGantt, Clarizen, LiquidPlanner, ProWorkFlow, Workzone, Bitrix24, Easy Project, Project Insight, Construxiv  / Grit Virtual, Projectcontrols.online, Project Plan 365, Gantter, VPlanner, NetPoint, Touchplan, Visual Planning, QLean, Jobsite Forecast, Nodes & Links, Scheduling Assistance Tool (SAT), Projectmates, PlanGrid, Float, and many others.