Aurora/Aurora CCPM Overview Introduction

 

Aurora/Aurora CCPM Overview Introduction

Aurora-&-Aurora-CCPM-Overview-Introduction-Thumbnail

The above slide deck, in PDF format, provides background information in a detailed overview of Aurora and Aurora-CCPM. This link provides the entire presentation as a video, also showing the videos and animations, including narration of the final slides. This link provides the same presentation as a .PPSX file that includes all of the videos and animation, download and view in Microsoft Project.

Resource Scheduling Difficult Even For Simple Problem

Resource-Scheduling-difficult-even-for-simple-problem-Thumbnail

The following presentation shows that resource scheduling is difficult even for seemingly trivial problems. Watch the following presentation and see if you could determine the optimal resource loaded schedule.

Scheduling is Difficult

Scheduling-is-Difficult-Thumbnail

The following slides provide an overview of why resource loaded scheduling is so difficult to optimize.

Intelligent Scheduling Benefits in 9 Slides

Intelligent-Scheduling-Benefits-in-9-Slides-Thumbnail

These 9 slides are to show the incredible benefits of intelligence scheduling in as compact a manner as possible. Make sure to watch in presentation mode to see the animations.

Aurora Unique Capabilities

Aurora Unique Capabilities


The following slides provide a brief overview of the unique capabilities of Aurora for intelligence scheduling and project management.

Aurora Lengthwise Flyer

One page lengthwise Aurora flyer summarizing benefits and some screenshots

Aurora two-page brochure

Two page Aurora brochure with benefits, features, screenshots and information regarding Stottler Henke.

Aurora-CCPM two-page brochure


Two-page Aurora-CCPM document with benefits, features, and other information
.

Aurora Lengthwise Flyer

One page lengthwise Aurora flyer summarizing benefits and some screenshots.

Order of Operations per Project Slides

Animation demonstrating difficulty of selecting best order to meet project deadlines with shared resources across projects.

Order of Operations per Project Video

Animation demonstrating difficulty of selecting best order to meet project deadlines with shared resources across projects.

Execution with Resources Slides

Animation demonstrating the difficulty of performing resource-constrained scheduling.

Execution with Resources Video

Animation demonstrating the difficulty of performing resource-constrained scheduling.